|

Thistle Hit the Heights of Medical Records
Storage
Thistle Storage Equipment has taken the storage of medical records
to a new level for NHS Lothian and Borders with the design and installation
of a 3 tier shelving installation with a capacity of over 5600 linear
metres.
The project has seen Thistle transform a dilapidated boiler house
into a stunning storage facility which features a self contained
structure that required no additional steelwork with the shelving
frames supporting the open mesh walkways and 2 stairways to access
all levels.
As well as the design and construction of the storage system, Thistle
demonstrated its expertise in managing large scale projects by taking
responsibility for the pre-works, making good the entire area prior
to the installation and overseeing the finishing touches that included
the lighting and lift installation.
Managing Director, Mike Cairns, said “This is a perfect example
of the scale and complexity of document storage solutions Thistle
have proved themselves to be capable of delivering. Our design team
identified a number of potential problems caused by service ducts
in the floor and incorporated structural steelwork and durbar plates
across the effected areas to allow for the point loads imposed by
the shelving.”
He continued, “Our unrivalled experience and expertise across
a wide range of storage equipment enables us to bring a fresh approach
to every project we undertake whilst ensuring the impeccable standards
that Thistle has built its reputation on is never compromised.”
For details of the full range of solutions and services available
from Thistle contact us now or call 01263 453888
|